Reconstruction of the locks of Saint-Malo (1948-1949)
Upstream doors under repair at the Dinan slipway - October 30, 1949
Home
You can see the upstream doors of the locks that have been dismantled and deposited in the Dinan slipway to be repaired.
Introduction
Plan
1948-1949
1950
August 2003
©Georges Jamet | Editor :
Hervé Jamet
| Hosting :
OVH